It is more faster and easier to pass the Microsoft 70-499 exam by using Highest Quality Microsoft Recertification for MCSD: Application Lifecycle Management questuins and answers. Immediate access to the Renovate 70-499 Exam and find the same core area 70-499 questions with professionally verified answers, then PASS your exam with a high score now.
♥♥ 2021 NEW RECOMMEND ♥♥
Free VCE & PDF File for Microsoft 70-499 Real Exam (Full Version!)
★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions
Free Instant Download NEW 70-499 Exam Dumps (PDF & VCE):
Available on:
http://www.surepassexam.com/70-499-exam-dumps.html
Q81. - (Topic 2)
You use Microsoft Test Manager (MTM) to manage your test environments.
You plan to test an ASP.NET website on various topologies (such as one-tier, two-tier, three-tier, and n-tier) to ensure that the website supports scalability.
You need to be able to deploy copies of predefined environments based on templates.
What should you do?
A. Create a System Center Virtual Machine Manager (SCVMM) environment for each topology and store them in the library. Use the library to deploy new environments.
B. Create new standard environments with physical machines.
C. Create new physical environments using physical machines.
D. Create new standard environments with machines that run under System Center Virtual Machine Manager (SCVMM).
Answer: A
Q82. - (Topic 2)
You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. Your team has all required permissions to run the reports on the SharePoint project portal.
You need to track the progress on resolving bugs by your team for the past week.
Which Excel report should you run?
A. Bug Trends
B. Bugs by Assignment
C. Run the Team Trend report.
D. Bug Progress
Answer: A
Q83. - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. You have a development team named Devi that is already using the server.
You hire a second development team named Dev2.
You need to ensure that the development activities of Dev2 are completely isolated from those of Dev1.
What should you do?
A. Use the TFS Administration Console to create a new team project collection for Dev2.
B. Run the TFSConfiq collection /create [name] command.
C. Use the TFS Administration Console to branch a new team project collection for Dev2 from the one used by Dev1.
D. Use Visual Studio Team Explorer 2012 to create a new team project collection for Dev2.
Answer: A
Q84. - (Topic 3)
You are using the Microsoft Solution Framework (MSF) for Capability Maturity Model Integration (CMMI) Process Improvement 6.0 process template.
A stakeholder has requested a change, but the change request has not received the attention that it requires.
You need to escalate the change request.
What should you do?
A.
.
Create an impediment work item.
.
Link the new impediment to the change request.
.
Escalate the impediment to get the change request on track.
B.
.
Create a bug work item.
.
Link the new bug to the change request.
.
Escalate the bug to get the change request on track.
C.
.
Create an issue work item.
.
Link the new issue to the change request.
.
Escalate the issue to get the change request on track.
D.
.
Create another change request work item.
.
Link the new change request to the change request.
.
Escalate the change request to get the change request on track.
Answer: D
Explanation: If a change request does not receive the attention that it requires, escalate the matter by creating an issue work item. Link the new issue to the change request, and escalate the issue to get the change request impact assessment on track.
http://msdn.microsoft.com/en-us/library/ee461569.aspx
Q85. - (Topic 2)
Your development team is working through their bug backlog and tracking their progress on the Bugs dashboard.
You look at the active bugs by assignment report and notice that the average size of your team members' bands for active bugs is increasing over time.
You need to identify the issues blocking the team's progress toward resolving and closing bugs.
Which issue should you investigate?
A. The bug backlog is divided evenly across the development team for resolution.
B. The test cases are outdated and are testing the wrong code.
C. The reactivated bugs that the development team is working through are resolving faster than expected.
D. The team has reallocated members to other non-priority tasks.
Answer: D
Explanation: http://msdn.microsoft.com/en-us/library/dd560860.aspx
Q86. - (Topic 2)
Your team uses the Microsoft Visual Studio Scrum 2013 process template in Microsoft Test Manager.
Your team wants to link all test cases to the related product backlog item or bug that they test.
You have a test case ID 121 and a product backlog item with ID 79.
What should you do?
A. Open the test case, and add a Parent link to product backlog item #79.
B. Open the product backlog item, and add a Related link to test case #121.
C. Open the product backlog item, and add a Child link to test case #121.
D. Open the test case, and add a Tests link to product backlog item #79.
Answer: A
Explanation: http://msdn.microsoft.com/en-us/library/vstudio/ff731576(v=vs.110).aspx
Q87. - (Topic 2)
You are a test developer using Microsoft Test Manager (MTM).
A test case that you maintain needs to be modified to test for a series of values returned
after a price calculation. You add a test step to test for these data values.
You need to add a parameter to the test case that represents the expected results.
What are two possible ways to achieve this goal? (Each correct answer presents a
complete solution. Choose two.)
A. Click in the test step Action column, then click Insert parameter and type the parameter name.
B. Enter the parameter name into the Parameter Values field and press Enter.
C. Click in the test step Expected Result column and type the parameter name preceded by the @ symbol.
D. Click in the test step Expected Result column, then click Insert parameter and type the parameter name.
E. Click in the test step Expected Result column and type the parameter name.
Answer: C,D
Q88. - (Topic 1)
Your client’s network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server installed at its main office.
The network administrator at a remote office reports high WAN utilization. Users at the remote office report slow response times when downloading source code.
You need to minimize WAN utilization and improve the response times for downloading source code.
What should you do?
A. Install TFS Server at the remote site and set up database synchronization between the existing TFS Server and the remote site.
B. Install and configure TFS Proxy at the remote site. Point the TFS Proxy to the TFS server and point Team Explorer to the TFS Proxy.
C. Install and configure IIS caching. Point Team Explorer to the IIS server.
D. Install TFS Proxy at the remote site. Configure TFS Proxy to point to the TFS Server and configure each user’s Visual Studio Source Control to use the proxy server for file downloads.
Answer: D
Q89. - (Topic 1)
You are planning to install a new Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
You need to ensure that the minimum supported version of Microsoft SQL Server is installed.
Which version should you install?
A. SQL Server 2005
B. SQL Server 2008 32-bit
C. SQL Server 2008 64-bit
D. SQL Server 2008 R2
E. SQL Server 2012
Answer: D
Q90. - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Developers use Visual Studio 2012.
Developers spend a significant amount of time dealing with the improper merging of change sets.
You need to ensure that developers are prevented from encountering merges.
What should you do?
A.
.
Require all developers to utilize a local workspace.
.
Within the Source Control Settings box, select the Enable get latest on check-out option.
B.
.
Require all developers to utilize a server workspace.
.
Within the Source Control Settings box, clear the Enable multiple check-out option.
C.
.
Require all developers to utilize a server workspace.
.
Within the Source Control Settings box, select the Enable get latest on check-out option.
D.
.
Require all developers to utilize a local workspace.
.
Within the Source Control Settings box, clear the Enable multiple check-out option.
Answer: B