Proper study guides for Improve Microsoft Recertification for MCSD: Application Lifecycle Management certified begins with Microsoft 70-499 preparation products which designed to deliver the Vivid 70-499 questions by making you pass the 70-499 test at your first time. Try the free 70-499 demo right now.
♥♥ 2021 NEW RECOMMEND ♥♥
Free VCE & PDF File for Microsoft 70-499 Real Exam (Full Version!)
★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions
Free Instant Download NEW 70-499 Exam Dumps (PDF & VCE):
Available on:
http://www.surepassexam.com/70-499-exam-dumps.html
Q21. - (Topic 3)
Your geographically dispersed development team is using the Microsoft Solution Framework (MSF) for Agile Software Development 6.0 process template.
You are developing an application that will function on several different types of mobile devices.
You need to ensure that developers have access to the designs for each device.
What should you do?
A. Create a Requirements work item type and attach the wireframe design.
B. Print the storyboards’ wireframe designs and tape them to the walls of the main development center.
C. Create a new task for each wireframe design.
D. Create wireframes in Microsoft PowerPoint and link them to the user stories.
Answer: D
210. - (Topic 3)
Your development team uses the Microsoft Solution Framework (MSF) for Agile Software Development 6.0 process template.
You need to determine the process to obtain the most accurate estimates for each user story in your product backlog.
What should you do?
A. Have the development team estimate and use the longest estimates.
B. Ask the product owner to provide the estimates.
C. Ask the scrum master to provide estimates.
D. Have the development team estimate until team members reach consensus.
Answer: D
Q22. DRAG DROP - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
A developer has left the company and still has files checked out. The developer’s computer is no longer available to undo the checkouts.
You need to undo any checked-out files for the user. You also need to delete the user’s workspace.
What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
Answer:
Q23. - (Topic 2)
...
You are using Microsoft Test Manager (MTM). You have developed a new test case.
You need to:
Set the test case priority,
Set the area where the test will be used, and
Update the work item state to Ready.
What should you do?
A. Open the Test Configuration Manager view and change the area path, priority, and state.
B. Open the Test Plan Manager view and change the area path, priority, and state.
C. Open the test case work item and change the area path, priority, and state.
D. Open the test plan Properties view and change the area path, priority, and state.
Answer: C
Q24. - (Topic 2)
You plan to conduct a manual test for an ASP.NET website by using Microsoft Test Manager (MTM). You create a test plan named Release 1.0 by using Testing Center in MTM.
You need to configure the Release 1.0 test plan so that all the test cases in the test plan will run against the following platforms:
. Microsoft Windows 7 and Windows Internet Explorer 8
. Microsoft Windows Server 2008 and Windows Internet Explorer 8
What should you do?
A. Create new test environments with the specified configuration settings and associate the newly created environment to the test plan by changing the automated test environment settings.
B. Create new test configurations with the specified configuration settings and associate the newly created configuration to the test plan by changing the configuration settings.
C. Create new test environments with the specified configuration settings and associate the newly created environment to the test plan by changing the manual test environment settings.
D. Create new test environments with the specified configuration settings and associate the newly created environment to the test plan by changing both the manual and automated test environment settings.
Answer: B
Q25. - (Topic 3)
You are developing an application by using a team of developers and a team of testers. You have an automated nightly build.
Currently, the testers take too long to test and the developers are closing a large number of bugs as “unable to reproduce.”
You need to improve the test cycle time.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
A. Enable code analysis.
B. Instruct the testers to use diagnostic data collection in their test environment.
C. Instruct the testers to test only every other build.
D. Instruct the testers to use action recordings and playback during manual testing.
E. Assign an extra day for testing at the end of the iteration.
Answer: B,D
Q26. DRAG DROP - (Topic 2)
You are using Microsoft Test Manager (MTM) to manage your testing efforts.
You plan to identify which tests are impacted by changes to the code.
You need to view a list of recommended tests from the Recommended tests view.
What should you do? (To answer, move the three appropriate actions from the list of
actions to the answer area and arrange them in the correct order.)
Answer:
Q27. - (Topic 2)
You are using Microsoft Test Manager (MTM) to run a test case. During the previous run of the same test case, a bug was filed. The developer could not reproduce the bug. The test settings assigned to the test plan do not include an adapter to collect IntelliTrace data.
You have created a test setting that includes the IntelliTrace data adapter.
You need to re-run the test with the settings that have the IntelliTrace data adapter.
What should you do?
A. Select the test case. Select the Run with option. Select the test setting that collects IntelliTrace information.
B. Select the test suite that contains the test case. Click Settings, then right-click IntelliTrace to enable it.
C. Open the test case. Click Settings to select the settings that have the IntelliTrace data adapter.
D. Run the test case with its default settings. Click View Results and locate the IntelliTrace file that was created when the test case was executed.
Answer: A
Q28. - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server. A single build machine is installed with one controller and two agents. The working directories are configured to use the following working directory:
$(SystemDrive)\Builds\$(BuildAgentId)\$(BuildDefinitionPath).
Your system drive is running out of space and some builds often fail with the following error:
“The specified path, file name, or both are too long. The fully qualified file name must be less than 260 characters, and the directory name must be less than 248 characters.”
You need to meet the following requirements:
. Point the working path to drive D. . Construct a working directory that can be used to define the shortest unique path for each build agent it is used on.
What should you do?
A. Set the Build Agent working directory path to D: \BId\$(BuildAqentld)\$(BuildDetinitionPath).
B. Create a system variable named BuildDrive and set its value to D: \.
C. Set the Build Service working directory path to D: \BId\$(BuildAqentld)\$(BuildDefinitionPath).
D. Set the Team Foundation Build variable named $(BuildDrive) to the value D: \.
Answer: A
Q29. - (Topic 2)
You are using Microsoft Test Manager (MTM). You are using the Microsoft Visual Studio Scrum 1.0 process template.
You are developing a test from an engineering document that has detailed verification information.
You need to ensure that the document is directly accessible whenever a tester runs a specific step.
What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)
A. Add a test step attachment.
B. Add a test case attachment.
C. Add a tested backlog items link.
D. Add a test case link.
Answer: A,B
Q30. DRAG DROP - (Topic 3)
Your team uses Microsoft Visual Studio Team Foundation Server (TFS) to manage the software development process. You use the Microsoft Visual Studio Scrum process template on your TFS Team Project.
You review your backlog before your sprint planning meeting and realize that one of your stories scheduled for the sprint is larger than your forecasted velocity.
You need to ensure that your backlog is ready for sprint planning.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer: