Proper study guides for Renew HP Delta - HPE Compute Solutions certified begins with HP HPE0-S60 preparation products which designed to deliver the Virtual HPE0-S60 questions by making you pass the HPE0-S60 test at your first time. Try the free HPE0-S60 demo right now.
Free HPE0-S60 Demo Online For HP Certifitcation:
NEW QUESTION 1
Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options - SAS connectivity installed in the first fabric - FC connectivity Installed In the second fabric - Ethernet connectivity installed in the third fabric.
Which statement regarding this setup is true?
- A. Each compute node must have at least 768GB of memory installed
- B. Interconnect modules that provide SAS connectivity should be moved to the third fabric
- C. Each interconnect module in each fabric must be properly licensed in HPE OneView
- D. Compute nodes must have a second CPU installed to access the second fabric.
Answer: A
NEW QUESTION 2
In the past a customer experienced a networking issue where network ports went down and came back up in quick succession.
Which HPE Virtual Connect SE 100 GD F32 Module for HPE Synergy feature can be configured to disable such ports?
- A. Pause flood protection
- B. sFlow
- C. Storm control
- D. Port flap protection
Answer: B
NEW QUESTION 3
You need to setup HPE Synergy frames after hardware components are discovered within HPE OneView. Put the steps to achieve this goal into the coned order in the answer area on the right.
Solution:
![HPE0-S60 dumps exhibit](/images/HPE0-S60.files/image010.jpg)
Does this meet the goal?
- A. Yes
- B. Not Mastered
Answer: A
NEW QUESTION 4
Click the area within the iLO management interface that will allow you to access workload Advisor.
Solution:
![HPE0-S60 dumps exhibit](/images/HPE0-S60.files/image004.jpg)
Does this meet the goal?
- A. Yes
- B. Not Mastered
Answer: A
NEW QUESTION 5
Match HPE Superdome Flex system with its specific feature.
Solution:
HPE Superdome flex in all 4
Does this meet the goal?
- A. Yes
- B. Not Mastered
Answer: A
NEW QUESTION 6
You modified a logical interconnect group mat is used to configure logical interconnects in five different logical enclosures. What will be the impact of that change?
- A. All physical interconnects from affected logical interconnects will be placed in a maintenance mode
- B. All physical interconnects from the affected logical interconnects must he rebooted to activate the new configuration
- C. All logical interconnects configured using this logical Interconnect group will report inconsistency
- D. All logical interconnects configured using this logical interconnect group will be automatically updated
Answer: A
NEW QUESTION 7
Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.
What should you do to resolve this issue?
- A. Disable deduplication for this volume at the array level
- B. Remove the offline disks using array management tools
- C. Install and configure MPIO on me Windows system
- D. Remove the offline disks using Windows Disk Management
Answer: C
NEW QUESTION 8
Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.
When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.
What must be done to fix this issue?
- A. Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.
- B. To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.
- C. The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.
- D. Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.
Answer: C
NEW QUESTION 9
Refer to the exhibit.
Which statement about this logical interconnect group is true?
- A. The master modules are located in the interconnect bays 2 and 5
- B. For the given downlink speed, the maximum number of frames is reached
- C. Both master modules are located in the same HPE Synergy frame
- D. To use interconnect bay set 3, all compute nodes must be half-height
Answer: C
NEW QUESTION 10
Your customer has a logical enclosure configured using a angle HPE Synergy frame with the following configuration
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- two HPE Synergy Virtual Connect SE 32Gb FC Modules -12 HPE Synergy 480 Gen10 Plus compute nodes with appropriate mezzanine cards
They plan to add a new HPE Synergy frame to an existing logical enclosure with the following configuration
- two HPE Synergy Virtual Connect SE 32Gb FC Modules
- two HPE Synergy 20Gb interconnect Link Modules
- Eight HPE Synergy 480 Gen 10 Plus compute nodes with appropriate mezzanine cards Which statement about the planned configuration change is true?
- A. Four compute modules must be moved to the second frame to balance the configuration
- B. The two HPE Synergy 20Gb interconnect Link Modules must be replace with the 50Gb option
- C. A license for an extended logical enclosure must be added to HPE OneView through GUI
- D. The HPE Synergy virtual Connect SE 32Gb FC Modules from both frames should be stacked
Answer: D
NEW QUESTION 11
Your customer has me following HPE Synergy setup
- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure
- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy
- Four HPE Synergy 50Gb interconnect Link Module
- Six HPE Synergy Virtual Connect SE 32Gb FC Modules The customer needs to add a frame.
Which statement about the expansion of this setup is true?
- A. The additional frame must have HPE Virtual Connect FC modules installed
- B. The customer can grow the existing logical enclosure up to 5 frames
- C. The customer has to create a new logical enclosure for the additional frame
- D. The additional frame cannot have 12Gb SAS connection modules installed
Answer: C
NEW QUESTION 12
Your customer reports that they cannot deploy HPE Synergy compute nodes using HPE OneView for VMware vCenter Server (HPE OV4VC).
What should you check during troubleshooting process?
- A. If HPE OneView credentials are added in vCenter Server
- B. If an compute nodes are added to the vCenter Server
- C. If the HPE Oneview instance Is integrated with HPE OV4VC.
- D. If vCenter Server is licensed in the HPE Oneview interface
Answer: B
NEW QUESTION 13
Which statement about manual orchestration during the firmware update is true?
- A. It is supported only for logical enclosures with at least three frames
- B. It provides an ability to select and update one side of the Interconnect topology at a time
- C. It provides the ability to install an older firmware version than currently Installed In the interconnect
- D. It allows all the interconnect modules to be activated manually at the same time.
Answer: B
NEW QUESTION 14
Match HPE SimpliVity term with the definition.
Solution:
![HPE0-S60 dumps exhibit](/images/HPE0-S60.files/image012.jpg)
Does this meet the goal?
- A. Yes
- B. Not Mastered
Answer: A
NEW QUESTION 15
An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement
Solution:
![HPE0-S60 dumps exhibit](/images/HPE0-S60.files/image006.jpg)
Does this meet the goal?
- A. Yes
- B. Not Mastered
Answer: A
NEW QUESTION 16
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster
You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard licenses for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options Which statement about this proposal is true?
- A. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
- B. vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features
- C. 2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup
- D. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.
Answer: B
NEW QUESTION 17
......
100% Valid and Newest Version HPE0-S60 Questions & Answers shared by Thedumpscentre.com, Get Full Dumps HERE: https://www.thedumpscentre.com/HPE0-S60-dumps/ (New 79 Q&As)