What Best Quality HPE0-S58 Free Practice Exam Is

Cause all that matters here is passing the HP HPE0-S58 exam. Cause all that you need is a high score of HPE0-S58 Implementing HPE Composable Infrastructure Solutions exam. The only one thing you need to do is downloading Ucertify HPE0-S58 exam study guides now. We will not let you down with our money-back guarantee.

Online HPE0-S58 free questions and answers of New Version:

NEW QUESTION 1
During a first-time installation of HPE Synergy, an external monitor is not available to the integrator. Which approach should the integrator take to perform the first-time setup?

  • A. Download MSTCS, connect the laptop to the front Panel Ethernet port, and open a RDP Session to 192.168.10.1 on port 443.
  • B. Download VNC Viewer, connect the laptop to the front Panel Ethernet port, and open a VNC-connection to 192.168.10.1 on port 5900.
  • C. Download Telnet, connect the laptop to the front Panel Ethernet port, and open a connection to 192.168.10.1 on port 8443.
  • D. Download PuTTY, connect the laptop to the front Panel Ethernet port, and open an SSH connection to 192.168.10.1 on any port (default is 22).

Answer: B

NEW QUESTION 2
Refer to the exhibit.
HPE0-S58 dumps exhibit
An integrator needs to add an FCoE connection to the server profile, but the FCoE connection type is not available.
What is the likely cause of this issue?

  • A. FCoE capable interconnect modules are not installed in the Synergy frame
  • B. Defined FCoE network is not associated with a SAN or does not have VLAN Id defined
  • C. A FCoE connection is not available, as there is no LIG configured for FCoE connectivity
  • D. The FCoE connection has not been added as a Fibre Channel connection within a server profile

Answer: D

NEW QUESTION 3
A Synergy integrator is unable to assign an HPE 3PAR Virtual Volume to a new server profile in HPE Composer. The Virtual Volume has been previously assigned to another profile.
Which setting in HPE Composer is preventing the integrator from assigning the volume to the new profile?

  • A. private, in the volume properties
  • B. shared, in the volume properties
  • C. private, in the storage pool properties
  • D. shared, in the storage pool properties

Answer: D

NEW QUESTION 4
A customer tries to revert a data volume located on the HPE 3PAR array to a specific snapshot that was taken using HPE Composer, but the process fails. What must an integrator do to fix this problem?

  • A. Install the snapshot agent on the operating system to enable online snapshot operations
  • B. Select the “Force” checkbox to ignore the warning, and revert to the snapshot because this is a data volume
  • C. Navigate to the SSMC and revert to the snapshot using HPE 3PAR tools
  • D. Disconnect the volume from the server, then revert to the snapshot and reconnect back to the server

Answer: C

NEW QUESTION 5
Using SSMC, an integrator has added a new CPG on the HPE 3PAR StoreServ array integrated with HPE Composer.
The new CPG is not visible in the HPE Composer.
What must the integrator do to see the new CPG in the HPE Composer console?

  • A. Run the discovery process on the 3PAR StoreServ array from the SSMC interface.
  • B. Add the CPG using the HPE Composer interface.
  • C. Add the CPG to the Storage Components scope using the SSMC interface.
  • D. Run the refresh procedure on the 3PAR StoreServ array from HPE Composer

Answer: D

NEW QUESTION 6
Which operating systems are supported for use with Image Streamer? (Choose two.)

  • A. VMware ESXi 6.7
  • B. CentOS 7.2
  • C. SUSE Linux Enterprise Server 11
  • D. Windows Hyper-V 2021
  • E. Red Hat Enterprise Linux 7.3

Answer: DE

Explanation:
References:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00061945en_us&docLocale=en_US

NEW QUESTION 7
An integrator prepares deployment documents with the list of all the hardware and software components. The integrator also needs a list of all infrastructure services deployed, with the functionality described.
Which services are provided by the vCenter Server component and should be placed in the report? (Choose two.)

  • A. Auto Deploy
  • B. Single Sign-On
  • C. Update Manager
  • D. Lookup Service
  • E. Certificate Authority

Answer: CD

NEW QUESTION 8
A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.
Which procedure should the integrator use to address the customer’s concern?

  • A. Connect the RJ-45 front ports of each frame to an external switc
  • B. Then, connect the uplink from the external switch into the customer’s management network.
  • C. Connect FLMs from all frames to two external switches for redundanc
  • D. Then, connect the two uplinks from the two switches into the customer’s management network.
  • E. Connect the RJ-45 front ports of each frame to two external switches for redundanc
  • F. Then, connect the uplink from the two switches into the customer’s management network.
  • G. Connect FLMs from all frames into a management rin
  • H. Then, connect the management ring to the customer’s management network using two uplinks.

Answer: D

NEW QUESTION 9
A customer has the following configuration: Frame 1
HPE0-S58 dumps exhibit Bay 1 – HPE Synergy 12Gb SAS Connection Module
HPE0-S58 dumps exhibit Bay 2
HPE0-S58 dumps exhibit Bay 3 – HPE Virtual Connect SE 40 GB F8 Module
HPE0-S58 dumps exhibit Bay 4 – HPE Synergy 12GB SAS Connection Module
HPE0-S58 dumps exhibit Bay 5
HPE0-S58 dumps exhibit Bay 6 – HPE Synergy 10 Gb Interconnect Link Module
Frame 2
HPE0-S58 dumps exhibit Bay 1 – HPE Synergy 12Gb SAS Connection Module
HPE0-S58 dumps exhibit Bay 2
HPE0-S58 dumps exhibit Bay 3 – HPE Synergy 10Gb Interconnect Link Module
HPE0-S58 dumps exhibit Bay 4 – HPE Synergy 12Gb SAS Connection Module
HPE0-S58 dumps exhibit Bay 5
HPE0-S58 dumps exhibit Bay 6 – HPE Virtual Connect SE 40Gb F8 Module
How many more frames can the customer add to their Synergy composable fabric? (Note: Enter your answer in the answer field below.)

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Frame 1 – Bay 2 – HPE Virtual Connect SE 100Gb F32 Module for Synergy (867796-B21)
Frame 1 – Bay 5 – HPE Virtual Connect SE 16Gb Fibre Channel Module for Synergy (779227-B21)
Frame 2 - Bay 2 – Brocade 16Gb/24 Power Pack+ Fibre Channel SAN Switch Module for HPE Synergy (K2Q86A)
Frame 2 – Bay 5 – HPE Synergy 4820C 10/20/25Gb Converged Network Adapter (876449-B21)

NEW QUESTION 10
What must an integrator do before an existing cluster can be imported to the HPE Composer?

  • A. The vCenter Server must be integrated with the HPE Composer
  • B. The cluster must be vSAN enabled
  • C. The HPE Composer must have at least two management interfaces to connect to the cluster
  • D. The cluster must be enabled for HPE Composer integration

Answer: A

NEW QUESTION 11
What are valid uses for an IPv4 address pool when configuring an HPE Synergy solution? (Choose two.)

  • A. assignment of IP addresses for NICs in an operating system
  • B. assignment of IP addresses for Composer appliances
  • C. assignment of IP addresses for PXE booting to a deployment server
  • D. assignment of IP addresses for interconnect modules
  • E. assignment of IP addresses for iLOs

Answer: DE

Explanation:
References: https://techlibrary.hpe.com/docs/synergy/shared/setup_overview/index.html

NEW QUESTION 12
A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPE Synergy platform.
Which steps must the integrator perform in the configuration to meet the customer’s needs?

  • A. Connect Satellite modules using Ports L1 and L4
  • B. Connect Ports Q7 and Q8 on the Master interconnect Modules (ICM)
  • C. Install Redundant Frame Link Modules and a second management ring
  • D. Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules

Answer: A

NEW QUESTION 13
A customer has a datacenter with 3-frame Master/Satellite Synergy solution. They plan to add two additional frames to the remote datacenter, but they want to have a single management tool.
How should the integrator set up the management of the datacenter?

  • A. Add two frames from the remote datacenter as remote enclosures using existing Composer
  • B. Install one Composer in every frame in both local and remote datacenter
  • C. Deploy one Composer in each site and link them together
  • D. Connect the management links with fibre cables if the distance between datacenters is more than 500m

Answer: A

NEW QUESTION 14
Which component of the HPE Synergy solution should you use to set the firmware/driver baseline and the installation method for Synergy Compute nodes?

  • A. Composer
  • B. Smart Update
  • C. Image Streamer
  • D. Global Dashboard

Answer: B

Explanation:
References: https://support.hpe.com/hpsc/doc/public/display?docId=c05212310

NEW QUESTION 15
A customer needs to deploy additional management components, such as vCenter Server and HPE Global Dashboard.
According to HPE best practices, how should an integrator deploy these components?

  • A. Deploy VMware HA cluster on two dedicated management servers, then deploy management components to this cluster.
  • B. Deploy vCenter Server as a virtual machine on the Hyper-V host and HPE Global Dashboard to the domain controller.
  • C. Install vCenter Server on the domain controller, then deploy HPE Global Dashboard to the HPE Composer or HPE OneView appliance.
  • D. Deploy vCenter Server to any Windows machine, and install HPE Global Dashboard on the same server.

Answer: B

NEW QUESTION 16
An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer’s environment.
Click where the integrator should verify that the cabling for the management ring was completed correctly.
HPE0-S58 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
HPE0-S58 dumps exhibit

NEW QUESTION 17
Which technology used in HPE SimpliVity allows a reduction in storage consumption?

  • A. trunking
  • B. hashing
  • C. consolidation
  • D. compression

Answer: D

NEW QUESTION 18
Refer to the exhibit.
HPE0-S58 dumps exhibit
A Synergy integrator needs to establish the module cluster links between two master modules, as shown. Which ports can the integrator use for the module cluster links?

  • A. 1 and 2
  • B. 3 and 4
  • C. 5 and 6
  • D. 7 and 8

Answer: D

Explanation:
References:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00017673en_us&docLocale=en_US (15)

NEW QUESTION 19
A customer is considering implementing a DRS cluster, but they would like to know how DRS can help to achieve performance goals.
How should an integrator respond?

  • A. When powering on a virtual machine, a DRS cluster can automatically place it on the optimal host.
  • B. Selected virtual machines will be assigned higher priority when the amount of physical resources will drop below a specific level.
  • C. A DRS cluster will migrate a virtual machine to a different host when available network bandwidth will drop below a specific level.
  • D. If more than 50 virtual machines will be running on a single host, DRS cluster will configure CPU affinity to proportional resource allocation.

Answer: B

NEW QUESTION 20
A customer has forgotten the password for the HPE Composer managing the customer’s HPE Synergy Infrastructure.
Where can the customer reset the password with the assistance of HPE Support?

  • A. FLM Access to Synergy Console
  • B. Virtual Center server
  • C. Front Access Panel to Synergy Console
  • D. Maintenance Console screen

Answer: A

Explanation:
References:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00028780en_us&docLocale=en_US

NEW QUESTION 21
A customer needs to expand a single-frame Synergy solution to two frames.
What should the integrator do to establish a proper management network for the two frames?

  • A. Connect the RJ-45 management ports of the Virtual Connect modules together with redundant CAT6Acables.
  • B. Disconnect the existing management ring, and cable the Frame Link Modules in the first frame to the Frame Link Modules in the added frame.
  • C. Connect the RJ-45 front panel connectors on the two frames together with a single CAT6A cable.
  • D. In the Synergy console, select the Frame Link Modules in the new frame and define the connection between them.

Answer: D

NEW QUESTION 22
......

P.S. Easily pass HPE0-S58 Exam with 97 Q&As Downloadfreepdf.net Dumps & pdf Version, Welcome to Download the Newest Downloadfreepdf.net HPE0-S58 Dumps: https://www.downloadfreepdf.net/HPE0-S58-pdf-download.html (97 New Questions)