The Down to date Guide To 642-980 bible Jul 2021

Cause all that matters here is passing the Cisco 642-980 exam. Cause all that you need is a high score of 642-980 Troubleshooting Cisco Data Center Unified Fabric exam. The only one thing you need to do is downloading Testking 642-980 exam study guides now. We will not let you down with our money-back guarantee.


♥♥ 2021 NEW RECOMMEND ♥♥

Free VCE & PDF File for Cisco 642-980 Real Exam (Full Version!)

★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW 642-980 Exam Dumps (PDF & VCE):
Available on: http://www.surepassexam.com/642-980-exam-dumps.html

Q21. Refer to exhibit. 

Customer has a pair of Cisco Nexus7010s switches and connected to a single Cisco Nexus5548 switch via vPC. Customer has a combination of M1 and F1 I/O Modules in Cisco Nexus7010s. 

Why is the design described not supported? 

A. Mixing I/O Modules on the Same Side of a Peer Link is not supported 

B. vPC does not support split control plane 

C. You can not configure a vPC peer link to configure two devices as vPCs 

D. Need to add another Cisco Nexus5548 switch to the topology to make this work. 

Answer:


Q22. Fibre Channel traffic on VSAN 12 between N5K2 and MDS9124-2 is degraded. Which statement explains the cause of this degradation? 

A. Performance is decreased by half due to the incorrect port type being used. 

B. The load-balancing scheme for VSAN 12 should be src-id/dst-id. 

C. B2B credits on N5K2 should be increased to 128. 

D. A VSAN port channel must be configured between N5K2 and MDS9124-2. 

Answer:


Q23. Refer to the exhibit. 

A customer is having a problem getting NPV to work. What is causing the problem? 

A. The core NPV switch port is not an F port. 

B. The core NPV switch port is in a shutdown state. 

C. The core NPV switch port is not configured on both ends. 

D. The core NPV switch port is not configured on the other end. 

E. The core NPV switch ports are in the wrong domain. 

Answer:


Q24. Your customer is an ISP providing service to thousands of end customers. Its main concerns are focused on using up the total number of 4096 VLANs per VDC, wasting an unused block of IP addresses, and IP address management. Which technique will address these concerns? 

A. create a separate VDC to scale VLAN limitation and upgrade to Cisco Nexus 7018 Switch 

B. segment VLANs using secondary IP addresses, which will reduce the management domain 

C. create mapping between the VLAN and VSAN to run FCoE to consolidate VLAN and IP addresses 

D. use PVLANs, which will solve the scalability problem and provide IP address management 

Answer:


Q25. Refer to the exhibit. 

The server port connected to the NPV edge switch does not come online. Which action should fix the problem? 

A. Move the NP ports on the NPV edge and the F ports on the NPIV into the same VSAN 

99. 

B. Move the NP ports on the NPV edge and the F ports on the NPIV in the default VSAN 1. 

C. Move all the ports into VLAN 1. 

D. Move all the ports into VSAN 99. 

E. Move all the ports into VLAN 99. 

Answer:


Q26. One of your Cisco Nexus Series interfaces has become errdisabled with the error message "DCX-No ACK in 100 PDUs". How often are these acknowledgements exchanged? 

A. 15 seconds 

B. 30 seconds 

C. 45 seconds 

D. 60 seconds 

Answer:


Q27. Which statement is true regarding STP? 

A. When the spanning-tree topology is calculated based on default parameters, the path between the source and destination end stations in a switched network might not be ideal. 

B. The path between the source and the destination end stations is always ideal with the default spanning-tree parameter. 

C. The path between the source and the destination end stations is determined by the speed of the link; the slowest link speed will become the root port during the election. 

D. The path between the source and the destination end stations is determined by the lowest MAC address; the lowest MAC address will become the root port during the election. 

Answer:


Q28. Refer to the exhibit. 

Customer is having problems with a device in VLAN100? What would fix the problem? 

A. Move the trunk port into VSAN 100. 

B. Change interface fc1fc1/1 into a trunk port and remove VSAN 100. 

C. Change interface fc2/4 into a trunk port. 

D. Change interface fc2/4 into VSAN 100. 

E. Change interface fc1fc1/2 into VSAN 100. 

Answer:


Q29. A customer is troubleshooting FCoE in its network. They have discovered that vFC is currently down and there is no active STP port state on the bound Ethernet interface. What should the STP port state be to correct this issue? 

A. The bound interface should be in an STP forwarding state for the native VLAN only. 

B. The bound interface should be in an STP learning state for both the native VLAN and the member FCoE VLAN that is mapped to the active VSAN. 

C. The bound interface should be in an STP forwarding state for both the native VLAN and the member FCoE VLAN that is mapped to the active VSAN. 

D. The bound interface should be in an STP blocking state for both the native VLAN and the member FCoE VLAN that is mapped to the active VSAN. 

Answer:


Q30. The installation of a new OTV network connecting two data centers via a service provider LAN has failed verification steps. Which statement explains why certain types of data are not being successfully transferred across the OTV network? 

A. The number of extended VLANs across all configured overlays may be greater than 256. 

B. The number of MAC addresses on either edge device may exceed 4000. 

C. The additional 42-byte OTV overhead, along with the DF bit being set, may cause the service provider to drop packets based on their 1500 MTU settings. 

D. Having more than two edge devices per site is not supported. 

Answer: