NEW QUESTION 1
Which of the following is an input to Develop Human Resource Plan?

  • A. Team performance assessment
  • B. Roles and responsibilities
  • C. Staffing management plan
  • D. Enterprise environmental factors

Answer: D

NEW QUESTION 2
Which items are components of a project management plan?

  • A. Change management plan, process improvement plan, and scope management plan
  • B. Agreements, procurement management plan, and work performance information
  • C. Schedule management plan, project schedule, and resource calendars
  • D. Scope baseline, project statement of work, and requirements traceability matrix

Answer: A

NEW QUESTION 3
Which tool or technique used in the Control Procurements process can be conducted during the execution of the project to verify compliance with deliverables?

  • A. Procurement documents
  • B. Inspection and audits
  • C. Estimate budget
  • D. Risk register

Answer: B

NEW QUESTION 4
Which type of analysis is used to determine the cause and degree of difference between the baseline and actual performance?

  • A. Schedule network analysis
  • B. Reserve analysis
  • C. Alternative analysis
  • D. Variance analysis

Answer: D

NEW QUESTION 5
An input required in Define Scope is an organizational:

  • A. structure.
  • B. process asset.
  • C. matrix.
  • D. breakdown structur

Answer: B

NEW QUESTION 6
Requirements documentation will typically contain at least:

  • A. Stakeholder requirements, staffing requirements, and transition requirements.
  • B. Business requirements, the stakeholder register, and functional requirements.
  • C. Stakeholder impact, budget requirements, and communications requirements.
  • D. Business objectives, stakeholder impact, and functional requirement

Answer: D

NEW QUESTION 7
When is a Salience Model used?

  • A. In a work breakdown structure (WBS)
  • B. During quality assurance
  • C. In stakeholder analysis
  • D. During quality control (QC)

Answer: C

NEW QUESTION 8
Which of the following is a conflict resolution technique that emphasizes areas of agreement rather than areas of difference?

  • A. Compromising
  • B. Collaborating
  • C. Smoothing
  • D. Problem Solving

Answer: C

NEW QUESTION 9
What are the identified risks for doing excessive decomposition in a WBS?

  • A. Insufficient project funding and disqualification of sellers
  • B. Insufficient project funding and ineffective use of resources
  • C. Disqualification of sellers and non-productive management efforts
  • D. Non-productive management effort and inefficient use of resources

Answer: D

NEW QUESTION 10
Which of the following tools or techniques is used for Estimate Activity Durations?

  • A. Critical path method
  • B. Rolling wave planning
  • C. Precedence diagramming method
  • D. Parametric estimating

Answer: D

NEW QUESTION 11
Enterprise environmental factors are an input to which process?

  • A. Control Scope
  • B. Define Scope
  • C. Plan Scope Management
  • D. Collect Requirements

Answer: C

NEW QUESTION 12
Which type of contract gives both the seller and the buyer flexibility to deviate from performance with financial incentives?

  • A. Cost Plus Incentive Fee (CPIF)
  • B. Fixed Price Incentive Fee (FPIF)
  • C. Cost Pius Award Re (CPAF)
  • D. Time and Material (T&M)

Answer: B

NEW QUESTION 13
In a construction project schedule, what is the logical relationship between the delivery of the concrete materials and the pouring of concrete?

  • A. Start-to-start (SS)
  • B. Start-to-finish (SF)
  • C. Rnish-to-finish (FF)
  • D. Finish-to-start (FS)

Answer: D

NEW QUESTION 14
Which of the following is a set of interrelated actions and activities performed to achieve a prespecified product, result, or service?

  • A. Portfolio
  • B. Process
  • C. Project
  • D. Program

Answer: B

NEW QUESTION 15
An intentional activity to modify a nonconforming product or product component is called:

  • A. defect repair
  • B. work repair
  • C. corrective action
  • D. preventive action

Answer: A

NEW QUESTION 16
The process of aggregating the estimated costs of individual activities or work packages to establish an authorized cost baseline is:

  • A. Determine Budget.
  • B. Baseline Budget.
  • C. Control Costs.
  • D. Estimate Cost

Answer: A

P.S. Easily pass CAPM Exam with 704 Q&As prep-labs.com Dumps & pdf Version, Welcome to Download the Newest prep-labs.com CAPM Dumps: https://www.prep-labs.com/dumps/CAPM/ (704 New Questions)