NEW QUESTION 1
Which of the following is an input to Develop Human Resource Plan?
- A. Team performance assessment
- B. Roles and responsibilities
- C. Staffing management plan
- D. Enterprise environmental factors
Answer: D
NEW QUESTION 2
Which items are components of a project management plan?
- A. Change management plan, process improvement plan, and scope management plan
- B. Agreements, procurement management plan, and work performance information
- C. Schedule management plan, project schedule, and resource calendars
- D. Scope baseline, project statement of work, and requirements traceability matrix
Answer: A
NEW QUESTION 3
Which tool or technique used in the Control Procurements process can be conducted during the execution of the project to verify compliance with deliverables?
- A. Procurement documents
- B. Inspection and audits
- C. Estimate budget
- D. Risk register
Answer: B
NEW QUESTION 4
Which type of analysis is used to determine the cause and degree of difference between the baseline and actual performance?
- A. Schedule network analysis
- B. Reserve analysis
- C. Alternative analysis
- D. Variance analysis
Answer: D
NEW QUESTION 5
An input required in Define Scope is an organizational:
- A. structure.
- B. process asset.
- C. matrix.
- D. breakdown structur
Answer: B
NEW QUESTION 6
Requirements documentation will typically contain at least:
- A. Stakeholder requirements, staffing requirements, and transition requirements.
- B. Business requirements, the stakeholder register, and functional requirements.
- C. Stakeholder impact, budget requirements, and communications requirements.
- D. Business objectives, stakeholder impact, and functional requirement
Answer: D
NEW QUESTION 7
When is a Salience Model used?
- A. In a work breakdown structure (WBS)
- B. During quality assurance
- C. In stakeholder analysis
- D. During quality control (QC)
Answer: C
NEW QUESTION 8
Which of the following is a conflict resolution technique that emphasizes areas of agreement rather than areas of difference?
- A. Compromising
- B. Collaborating
- C. Smoothing
- D. Problem Solving
Answer: C
NEW QUESTION 9
What are the identified risks for doing excessive decomposition in a WBS?
- A. Insufficient project funding and disqualification of sellers
- B. Insufficient project funding and ineffective use of resources
- C. Disqualification of sellers and non-productive management efforts
- D. Non-productive management effort and inefficient use of resources
Answer: D
NEW QUESTION 10
Which of the following tools or techniques is used for Estimate Activity Durations?
- A. Critical path method
- B. Rolling wave planning
- C. Precedence diagramming method
- D. Parametric estimating
Answer: D
NEW QUESTION 11
Enterprise environmental factors are an input to which process?
- A. Control Scope
- B. Define Scope
- C. Plan Scope Management
- D. Collect Requirements
Answer: C
NEW QUESTION 12
Which type of contract gives both the seller and the buyer flexibility to deviate from performance with financial incentives?
- A. Cost Plus Incentive Fee (CPIF)
- B. Fixed Price Incentive Fee (FPIF)
- C. Cost Pius Award Re (CPAF)
- D. Time and Material (T&M)
Answer: B
NEW QUESTION 13
In a construction project schedule, what is the logical relationship between the delivery of the concrete materials and the pouring of concrete?
- A. Start-to-start (SS)
- B. Start-to-finish (SF)
- C. Rnish-to-finish (FF)
- D. Finish-to-start (FS)
Answer: D
NEW QUESTION 14
Which of the following is a set of interrelated actions and activities performed to achieve a prespecified product, result, or service?
- A. Portfolio
- B. Process
- C. Project
- D. Program
Answer: B
NEW QUESTION 15
An intentional activity to modify a nonconforming product or product component is called:
- A. defect repair
- B. work repair
- C. corrective action
- D. preventive action
Answer: A
NEW QUESTION 16
The process of aggregating the estimated costs of individual activities or work packages to establish an authorized cost baseline is:
- A. Determine Budget.
- B. Baseline Budget.
- C. Control Costs.
- D. Estimate Cost
Answer: A
P.S. Easily pass CAPM Exam with 704 Q&As prep-labs.com Dumps & pdf Version, Welcome to Download the Newest prep-labs.com CAPM Dumps: https://www.prep-labs.com/dumps/CAPM/ (704 New Questions)